Firmus IPO price drops back down to earth

At an expected $9, the Firmus IPO price is close to our central estimate, but with 865MW still to be built there is little margin for error.


ASX IPO: AIFFirmus Grid (Firmus Technologies) – lists 23/10/2026
~$9.00Expected offer price, cut from $11 · data as at 08/10/2026
Market cap at ~$9~$37bn
Raise$7.1–7.9bn
Contracted capacity911MW
Operating today46MW
Our viewHyped
WhenOnly below $9
TypeGrowth IPO
RiskHigh

Marcus Today straight talk

Australia’s SpaceX brought back down to earth. The hype is coming out of the price. Talk started at $50bn, the offer was set at $11 ($43.9bn), and on Wednesday night the float was repriced, with fund managers now expecting about $9 a share – roughly $37bn. The numbers add up on paper: US$67.8bn of contracts and a US$5.8bn EBIT target. But they rest on 865MW still to be built, roughly US$30bn of debt at a time AI borrowing costs are rising, and revenue last year of just US$50.8m. At $9 the price is close to our central estimate, so there is little margin for error. At first impressions, our fair value is 4–32% below the original $11 offer price, and roughly in line at $9. Please note: Firmus is valued relative to global peers and there are differing opinions as to how fairly valued these peers currently are. Expect the volatility in share price to be high post-IPO.

In brief

Firmus is raising $7.1bn (US$5bn), up to $7.9bn with the greenshoe – the second-largest Australian IPO after Telstra. The offer was set at $11 a share but is being repriced, with about $9 expected. More than half the book is going to existing backers, including Nvidia (7.2%) and Blackstone (6.7%). It has 46MW running and 865MW in five projects under way in Indonesia, Malaysia and Tasmania, contracted to Meta, OpenAI and Fireworks AI. Investors were told the sites would generate US$5.8bn of EBIT (earnings before interest and tax) once built. The institutional bookbuild closes at 9am on Thursday 8 October.

Offer value at ~$9~$37bn
Our fair value$30–42bn
Our central estimate~$36bn
Probability-weighted~$39bn
Value per share~$8.67Central, at a $9 offer
Tradable at debut~58%
Marcus Today verdictAIF – Firmus Grid (IPO)

We estimate fair value at $30–42bn, with a central estimate of about $36bn. At the original $11 ($43.9bn) the float was priced above the top of our range. At the expected $9 (about $37bn) it sits inside our range and about 4% above our central estimate of $8.67 a share, with the probability-weighted value at $9.46. The disclosures reconcile on paper, but they depend on 865MW being built on time and about US$30bn of new debt as AI borrowing costs climb.

Key reasons

1

A real contract book. US$67.8bn of contract value, mostly take-or-pay, with Meta at Melbourne and Batam and OpenAI at two Kuala Lumpur sites.

2

Strategic backers are buying more. More than half the book is reserved for existing holders, including Nvidia (7.2%) and Blackstone (6.7%).

3

The price is well ahead of the last round. Investors came in at a US$10.5bn valuation in August. Even at $9, Firmus would be valued at about US$26bn – roughly 2.5 times that, two months later.

4

The build is debt-funded. Banks expect roughly US$30bn of debt, raised against customer contracts rather than an investment-grade rating. At 7%, interest would be about US$2.1bn a year – more than a third of the US$5.8bn EBIT target – and a new AI data-centre loan this week priced at about 11%.

5

Supply overhang from day one. Only 42.4% of shares are escrowed, founders can monetise up to 10% of their holdings in the first year, and at least one hedge fund has flagged a short.

What would change the view?

A final price below $9, a prospectus confirming the take-or-pay terms and the cost of the debt, and Batam and Launceston starting on time in early 2027 would make the stock more attractive. Further repricing on weak demand, rising debt costs, delays in Batam or Tasmania, or heavy early selling would make it less so.

Our fair value$30–42bn
Offer value at ~$9~$37bn
Risk ratingHigh
Marcus Today
Independent research for Australian investors
marcustoday.com.au – General information only, not financial advice
Company description

Firmus is a seven-year-old Sydney-based builder and operator of ‘AI factories’ – liquid-cooled data centres packed with Nvidia GPUs that it rents to AI labs and hyperscalers on multi-year, mostly take-or-pay contracts. It started in Launceston, Tasmania, running Bitcoin mining on cheap hydro power, then pivoted to AI compute. Today it runs 46MW in Melbourne and Singapore and has 865MW in five projects under way. Revenue last financial year was US$50.8m. Its private valuation has gone from $1.85bn in September 2025 to US$10.5bn (about $15bn) in August 2026. The IPO was set at $11 ($43.9bn) and is being repriced to about $9 (about $37bn). Beyond today’s 911MW it has 2.9GW planned in Australia and an agreement with Nvidia to buy up to 10GW of GPUs over five years.

Co-CEOs Oliver Curtis, Tim Rosenfield Founded 2019 (Firmus Grid)
Co-founder Jonathan Levee HQ Sydney, NSW
CFO Kristy Godfrey-Billy Listing 23/10/2026 (ASX: AIF)
Shares at listing ~4.15bn at $9 Sites 7 (2 operating)
Batam, Indonesia360MWMeta, Fireworks; from early 2027
Kuala Lumpur398MWTwo sites for OpenAI; 2027–28
Tasmania107MWLaunceston and Wesley Vale
Operating46MWMelbourne (Meta) and Singapore

Key shareholders (disclosed or reported): Nvidia (7.2%), Blackstone (6.7%), Coatue, Jane Street, Maas Group (ASX: MGH), Regal Funds Management, Ellerston Capital, Archibald Capital and the founders, who hold about 15% between them, with relatives holding a further 8%. Maas Group is the only listed Australian way to own a piece of Firmus before the float: it holds a stake worth $400m at cost and an $855m contract to supply Power Cube electrical units.

Valuation levels

Repriced to about $9, the offer moves inside our fair value range

Equity value in A$bn. The original $11 offer was above our range; the expected $9 is close to our central estimate.

August 2026 round~$15bn
Bear case~$25bn
Our fair value range$30–42bn
Our central estimate~$36bn
Probability-weighted~$39bn
Expected offer at ~$9~$37bn
Original offer at $11$43.9bn
Bull case~$60bn
$0bn$10bn$20bn$30bn$40bn$50bn$60bn$70bn
Funding history and private valuations

Even at $9, the valuation has risen about 20-fold in 13 months

Post-money valuation in A$bn at each raise. The IPO bar uses the expected $9 offer.

Sep 2025 equity$1.85bn
Nov 2025 equity~$6bn
Feb 2026 Maas stake~$6bn
Apr 2026 Coatue round~$8bn
Aug 2026 strategic round~$15bn
Oct 2026 IPO at ~$9~$37bn
Oct 2026 · ASX IPO (bookbuild)
Amount$7.1bn (US$5bn), up to $7.9bn
Post-money~$37bn at ~$9 ($43.9bn at $11)
Lead and key investorsMore than half to existing holders; institutions and retail
Aug 2026 · Strategic equity
AmountUS$2bn (~$2.8bn)
Post-money>US$10.5bn (~$15bn)
Lead and key investorsCoatue, Nvidia, Blackstone Tactical Opportunities, Jane Street
Aug 2026 · Maas Group top-up
Amount$300m shares and preference shares
Post-moneyNot disclosed
Lead and key investorsMaas Group
Apr 2026 · Strategic equity
AmountUS$505m
Post-moneyUS$5.5bn (~$8bn)
Lead and key investorsCoatue, Nvidia
Feb 2026 · Debt facility
AmountUS$10bn (~$14bn)
Post-moneyn/a
Lead and key investorsBlackstone Credit, Blackstone Tactical Opportunities, Coatue
Feb 2026 · Strategic stake
Amount$100m (1.7%)
Post-money~$6bn
Lead and key investorsMaas Group
Nov 2025 · Equity raise
Amount$500m
Post-money~$6bn
Lead and key investorsMorgans (lead manager)
Sep 2025 · Equity raise
Amount$330m
Post-money$1.85bn
Lead and key investorsNvidia and others

Investors bought in at a US$10.5bn valuation in August. At $11 the IPO valued Firmus at US$30.7bn – about 2.9 times that. After offshore demand came in lighter than expected, the float was repriced on 7 October, with about $9 (US$26bn) now expected.

IPO timetable and catalysts
6–8/10/2026   Institutional bookbuildCloses 9am Thursday 8 October. Repriced from $11 on 7 October; fund managers expect about $9. Existing backers could take up the slack.
12/10/2026   Prospectus lodged (reported)Final terms, the take-or-pay contracts, the debt package and the escrow schedule.
Mid-Oct   Retail offerMinimum bid $5,000 through brokers.
23/10/2026   ASX debutConditional and deferred settlement trading as AIF; normal trading from 27 October. Likely fast entry to the ASX 200.
Early 2027   Batam and Launceston startPhased operations at Batam (360MW) and Launceston (84MW) – the first test of the build schedule.
2027–28   Kuala Lumpur sites398MW across two sites for OpenAI.
Oct 2027   First-year limits endFounders can monetise up to 10% of their holdings in the first 12 months; further sell-downs are linked to the shares trading above $11.
Offer details
Offer price
Set at $11; repriced on 7 October, with about $9 expected
Raise
$7.1bn base (US$5bn), up to $7.9bn (US$5.5bn) with the greenshoe
Market cap
$43.9bn (US$30.7bn) at $11; about $37bn (US$26bn) at $9 if the raise is unchanged
Enterprise value
About US$60bn including roughly US$30bn of debt, per analysts on the deal
Allocation
More than half to existing strategic backers and fund managers
Escrow
42.4% of shares escrowed, so about 57.6% (~$25bn) could trade at debut
Use of funds
Servers $3.46bn, deployment $0.93bn, liquidity reserve $2.21bn, working capital and costs $0.54bn
Joint lead managers
Morgan Stanley, Bank of America, JPMorgan, Morgans (fees about $215m)
Later
A Nasdaq dual listing is possible. Debt is raised against customer contracts and the GPUs, with partners such as Blackstone

What we are watching: the final price, how much of the book existing holders take up, the cost of the next debt package, and how the shares trade in the first week against a free float of more than half the company.

Business model and operations

Firmus has 911MW contracted, but only 46MW is running. In our view it is a contract book, not yet an earnings stream.

How it makes money

Firmus fits out the data hall, buys the Nvidia systems and sells GPU capacity on multi-year contracts, mostly take-or-pay – customers pay for reserved capacity whether they use it or not. This is the ‘neocloud’ model used by CoreWeave and Nebius. The three Asian projects sit in leased third-party data centres; the Tasmanian sites are its own. Server budgets across the disclosed sites total about US$36bn.

Customers

Meta – uses the Melbourne site, has contracted capacity at Batam and signed a further South-East Asia deal in early October. OpenAI – dedicated capacity at two Kuala Lumpur AI factories on Nvidia’s Vera Rubin platform. Fireworks AI – part of the Batam capacity. Asia accounts for about 86% of contracted revenue.

Melbourne (CDC Brooklyn)
LocationVictoria
Capacity42MW
Status and timingOperating; Meta
Singapore AI cloud
LocationSingapore
Capacity~4MW
Status and timingOperating
Batam
LocationIndonesia
Capacity360MW
Status and timingUnder construction; phased from early 2027; Meta, Fireworks
Kuala Lumpur KVTP
LocationMalaysia
Capacity192MW
Status and timingCompletion in 2027; OpenAI
Kuala Lumpur SVTP
LocationMalaysia
Capacity206MW
Status and timingCompletion 2027–28; OpenAI
Launceston
LocationTasmania
Capacity84MW
Status and timingUnder construction; from early 2027
Wesley Vale
LocationTasmania
Capacity23MW
Status and timingDevelopment application in progress; 2027
Valuation vs global peers
Firmus at ~$9 (equity)
Price 07/10~$9.00
EV (US$bn)~26.2
EV/CY27 rev–
EV per MW (US$m)~29
EV/backlog0.39x
Consensus target–
Firmus at ~$9 (incl. debt)
Price 07/10~$9.00
EV (US$bn)~56
EV/CY27 rev–
EV per MW (US$m)~62
EV/backlog0.83x
Consensus target–
Firmus at $11 (equity)
Price 07/10$11.00
EV (US$bn)~30.7
EV/CY27 rev–
EV per MW (US$m)~34
EV/backlog0.45x
Consensus target–
Firmus at Aug 2026 round
Price 07/10Private
EV (US$bn)~10.5 (equity)
EV/CY27 rev–
EV per MW (US$m)~12
EV/backlog0.15x
Consensus target–
Nebius (NASDAQ: NBIS)
Price 07/10US$237.15
EV (US$bn)67.2
EV/CY27 rev5.5x
EV per MW (US$m)67
EV/backlog1.7x
Consensus targetUS$288.45 (+21.6%)
CoreWeave (NASDAQ: CRWV)
Price 07/10US$88.45
EV (US$bn)94.8
EV/CY27 rev3.6x
EV per MW (US$m)26
EV/backlog0.7x
Consensus targetUS$141.55 (+60.0%)
IREN (NASDAQ: IREN)
Price 07/10US$38.69
EV (US$bn)17.2
EV/CY27 rev6.3x
EV per MW (US$m)21
EV/backlog–
Consensus targetUS$80.21 (+107.3%)
Cipher Digital (NASDAQ: CIFR)
Price 07/10US$14.56
EV (US$bn)10.8
EV/CY27 rev–
EV per MW (US$m)12
EV/backlog0.9x
Consensus target–
TeraWulf (NASDAQ: WULF)
Price 07/10US$14.22
EV (US$bn)9.7
EV/CY27 rev–
EV per MW (US$m)12
EV/backlog0.5x
Consensus target–
NextDC (ASX: NXT)
Price 07/10$10.23
EV (US$bn)~6.5
EV/CY27 rev~14.5x
EV per MW (US$m)9
EV/backlog–
Consensus target$20.13 (+96.8%)
Applied Digital (NASDAQ: APLD)
Price 07/10US$23.81
EV (US$bn)10.5
EV/CY27 rev–
EV per MW (US$m)7
EV/backlog0.3x
Consensus target–
Crusoe (private, Sep 2026)
Price 07/10Private
EV (US$bn)30.9 (equity)
EV/CY27 rev–
EV per MW (US$m)5
EV/backlog0.2x
Consensus target–

At about $9, Firmus’s equity alone is worth about US$29m per contracted MW – a modest premium to CoreWeave (US$26m) and IREN (US$21m). Add the roughly US$30bn of debt it is expected to need and the figure is about US$62m per MW, close to Nebius, for a company with 46MW running.

Global peers at a glance
Firmus (AIF)
ModelNeocloud: fits out sites, owns GPUs
Key customersMeta, OpenAI, Fireworks
Power (MW)911 contracted; 46 operating
Backlog (US$)US$67.8bn contract value
CoreWeave
ModelNeocloud, the scale leader
Key customersMicrosoft, OpenAI, Meta
Power (MW)1,500 active; ~3,700 contracted
Backlog (US$)~US$129bn
Nebius
ModelNeocloud with own software
Key customersMicrosoft, Meta, Cohere
Power (MW)800–1,000 by December 2026
Backlog (US$)~US$40bn
IREN
ModelEx-Bitcoin miner turned neocloud
Key customersMicrosoft (US$9.7bn), a frontier AI lab
Power (MW)300 IT load in 2026; 800 in 2027
Backlog (US$)US$4.0bn contracted ARR
Applied Digital
ModelLandlord: 15-year leases
Key customersHyperscaler, CoreWeave
Power (MW)1,410 contracted; 175 live
Backlog (US$)~US$36bn
Cipher Digital
ModelEx-miner turned landlord
Key customersHyperscale tenants
Power (MW)907 operating plus contracted
Backlog (US$)~US$11.4bn
TeraWulf
ModelEx-miner turned landlord
Key customersAnthropic, Fluidstack/Google
Power (MW)~840 built or under construction
Backlog (US$)>US$19bn
NextDC
ModelColocation landlord
Key customersHyperscalers, enterprise
Power (MW)740 contracted; 288 built
Backlog (US$)565MW order book
Crusoe
ModelVertically integrated: energy to GPUs
Key customersOpenAI (Abilene)
Power (MW)>6,000 contracted; 1,000 live
Backlog (US$)>US$140bn contract value
Nscale
ModelNeocloud, UK and Europe
Key customersAnthropic (~US$45bn), Microsoft
Power (MW)>10,000 pipeline
Backlog (US$)US$56.4bn contracted
Lambda
ModelNeocloud, developer-focused
Key customersMicrosoft, Nvidia
Power (MW)Not disclosed
Backlog (US$)2026 revenue >US$1.5bn projected
Earnings outlook

The numbers now reconcile – on paper. Investors were told the sites would generate US$5.8bn of EBIT once built. Revenue last financial year was US$50.8m, and the draft prospectus reportedly points to a pro forma loss of about US$77m in the first half. We checked the target from the bottom up.

1

Revenue per MW. Contracted revenue of A$20.2bn a year (summed across sites) on 911MW is about US$15.5m per MW – inside the US$13–20m range we assumed, and below the US$20–25m Nebius cites.

2

Margin. Target project EBITDA is 91% and project EBIT 41%, before corporate costs. CoreWeave’s adjusted operating margin was about 5% in Q2 2026, because GPU depreciation absorbs most of its EBITDA.

3

Debt. About US$30bn of debt at 7% would cost roughly US$2.1bn a year in interest – more than a third of the US$5.8bn EBIT target.

CoreWeave 2027 EPS-US$1.91Positive in 2028
Nebius 2027 EPS-US$3.54Still negative in 2028
IREN FY27 EPS-US$1.90Consensus

Consensus on the listed peers supports caution: all three are forecast to lose money next year. In our view 12x the US$5.8bn target, less the debt, is worth about $57bn once every site is built – but that is two years and 865MW away, and every 1% on the cost of US$30bn of debt is about US$300m a year off pre-tax profit.

Our valuation
Three ways we triangulated value
EV per contracted MW
Implied value$33–46bn
Key assumption911MW at US$25–35m per MW: CoreWeave (US$26m) and IREN (US$21m) plus a premium for the contract book
Discounted run-rate EBIT
Implied value$24–37bn
Key assumptionUS$5.8bn target cut 10–25% for corporate costs and delays, at 12x, less about US$30bn of debt, discounted two years at 12–15%
Step-up from the August round
Implied value$31–39bn
Key assumptionUS$10.5bn plus US$5.5bn of IPO cash, re-rated 35–70% for the contracts and listing
Blended fair value
Implied value$30–42bn (central ~$36bn)
Scenarios per share at the expected $9 offer price
Bull
Probability25%
Market value~$60bn
Per share$14.45
What has to happenEvery site on time, the US$5.8bn EBIT target met, AI enthusiasm holds, index buying
Base
Probability50%
Market value~$36bn
Per share$8.67
What has to happenSites delivered with modest delays; valued in line with the neocloud peers
Bear
Probability25%
Market value~$25bn
Per share$6.02
What has to happenBuild slips at Batam or Tasmania, debt costs rise or an AI capex pullback; trades like the landlords
Probability-weighted
Market value~$39bn
Per share$9.46

Per-share values assume about 4.15bn shares at $9 (the $7.9bn raise unchanged). At $9 our base case implies about 4% downside and the probability-weighted value about 5% upside. At the original $11, the same values were $9.02 and $9.84 a share – 18% and 11% below the offer.

What could hold the price up after listing

A lower entry price, strategic holders taking more than half the book, likely fast entry to the ASX 200 and strong Australian demand for AI exposure. CoreWeave priced below its range in March 2025 at US$40 and now trades at US$88.45. Against that, about 58% of the company can trade from day one. Early trading could run well ahead of fundamentals, in either direction.

Broker research
What the brokers say (as at 07/10/2026)
CoreWeave (CRWV)
33 of 46 analysts rate it Buy or Strong Buy. The average target of US$141.55 is 60.0% above the price, but targets range from US$39 to US$278 – little agreement on neocloud value.
Nebius (NBIS)
16 of 25 analysts rate it Buy or Strong Buy. The average target of US$288.45 is 21.6% above the price. The shares fell 5.1% on 7 October.
NextDC (NXT)
Consensus target $20.13 against $10.23 (+96.8%). The shares have fallen about 10% since late September. Citi reiterated Buy ($21.15) on 6 October; Morgans is at Hold ($15.00).
Maas Group (MGH)
Consensus target $7.95 against $6.39. Macquarie Outperform ($8.15, 5 October), Morgans Buy ($7.75), Canaccord Buy ($6.49). The shares fell 5.8% on 7 October.
Key risks
 

Build and delivery. Only 46MW is running. 865MW must be delivered across Indonesia, Malaysia and Tasmania in 2027–28, and any slippage pushes out revenue while interest and depreciation keep running.

 

Debt and funding. Analysts on the deal expect about US$30bn of debt for the current pipeline. Management says equity funding is adequate for 12 months; the 2.9GW Australian pipeline and the Nvidia 10GW agreement would need far more debt and equity.

 

Customer concentration. Meta and OpenAI dominate the contract book, and Asia is about 86% of contracted revenue. OpenAI’s spending commitments far exceed its revenue.

 

Pricing and demand. Offshore demand came in below expectations and the float was repriced from $11. Neocloud peers fell between 3.6% and 6.3% on 7 October.

 

Cost of capital. A new AI data-centre loan this week priced at about 11%, and CDC’s owners have marked its value down on higher borrowing costs. Firmus has no investment-grade rating and borrows against customer contracts.

 

Share overhang. About 58% of shares can trade at debut, founders can monetise up to 10% in the first year, and at least one hedge fund has flagged a short.

 

GPU obsolescence. Chips are depreciated over roughly six years, but Nvidia launches a new generation every year. Re-contracting prices for older GPUs are unproven.

 

Related parties. Nvidia is supplier, shareholder and financier; Maas Group is shareholder and contractor. The prospectus should spell out these terms.

 

Partner fallout. The Southgate partnership with CDC has ended. Firmus says plans are unaffected, but it removes the larger Australian pipeline.

 

Disclosure gap. Revenue last year was US$50.8m and a first-half loss is expected. The earnings targets are project-level and exclude corporate costs.

Disclosures

General information only. This content does not take into account your objectives, financial situation or needs. Consider whether it is appropriate for you and read the relevant PDS or prospectus before acting. Forecasts are possibilities, not guarantees.

Log in
FAQ
Forgotten your password?
My account

Please log in to view your account details.

Log in